📏 1. Installation Area

  • Minimum Space: 2.58 m (length) Ă— 1.5 m (width) Ă— 2.5 m (height).

  • Surface: Flat, solid, vibration-free, and non-metallic.

  • Metal Objects: Must be at least 2 m away from the Apstec Merlin system;
    for large metal structures — up to 4 m.

  • Electrical Equipment:
    Keep a distance of 0.5–4 m from potential interference sources (monitors, transformers, motors, power cables, etc.).

  • Stability:
    The system must not sway or require frequent recalibration due to wind or vibration.

  • Inspection Zone: No foreign objects inside the inspection zone.


 Installation site requirements

🖥️ 2. Operator’s Workstation

  • A power socket and an Ethernet port must be available near the operator’s desk.

  • The connection between the operator’s PC and the Apstec Merlin system should be established via Ethernet cable, either directly or through a local network (minimum speed: 100 Mbit/s).

đź”’ 3. Remote Access & GDPR Compliance

  • Remote Access: Remote access is required for technical support and system monitoring via a secure, encrypted Internet channel. If an Internet connection is not possible, the setup must be coordinated with the APSTEC Technical Support Team.

  • GDPR Compliance: All data is processed locally on the device — no cloud processing is required for Apstec Merlin operation.

🚨 CRITICAL REQUIREMENT:

Each installation site must be approved by the APSTEC Technical Support Team. Do not move the system without their consent — this may lead to reduced performance.