HSR.4B INSTALLATION SITE REQUIREMENTS

HSR.4B INSTALLATION SITE REQUIREMENTS

Location:
  • Minimum space: 5.0 m (L) × 4.1 m (W) × 3.0 m (H)

  • Must allow installation of deflectors on HSR pillars

  • No floor or nearby vibrations

  • No direct sunlight on video cameras

  • No large static/moving metal objects within 3 m of the system

  • No foreign objects in the inspection zone

Notes
Installation must be approved by APSTEC specialists.

Power Supply:
  • 220–240 V, 50 Hz, 1.3 kW. Socket should be near one of the HSR pillars (CEE 7/7, type F/E grounded).

Operator’s PC Location:
  • Power socket with Ethernet (Internet)

  • Power socket: 180–240 V, 50 Hz

Network:
  • Connection between HSR and PC via:
    a) Direct Ethernet cable
    b) Local Ethernet network with fixed IP for HSR

  • Minimum speed: 100 Mbit/s

Remote Access:
  • Internet required for remote monitoring and support (via encrypted channel).

  • If Internet access is unavailable, consult APSTEC support.